United States β€Ί Grid β€Ί Interconnection queues β€Ί Montana

ONSHORE WIND Β· WEST

Onshore wind project 48, Teton County

Onshore wind project 48, Teton County is a 18.9 MW onshore wind request withdrawn in the West interconnection queue, in Teton County, Montana, connecting to NorthWestern Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2006 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
48
Grid region
West (non-ISO utilities)
Utility / transmission owner
NorthWestern Energy
Connection point (POI)
Choteau 69kV Substation
Location
Teton County, Montana
Technology
Wind: 18.9 MW
Total requested
18.9 MW
Study phase
Feasibility
Queue status
Withdrawn
Entered queue
12 June 2006

Location

Marker shows the centre of Teton County; the queue data does not give exact sites.

Power plants in Montana Β· Transmission lines in Montana

Other requests in Teton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem