🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Montana

HYDRO · WEST

Hydro project 62, Teton County

Hydro project 62, Teton County is a 11.5 MW hydro request built and operating in the West interconnection queue, in Teton County, Montana, connecting to NorthWestern Energy.

Queue statusOperating
  1. PlanningQueued May 2007 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingJun 2009 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
62
Grid region
West (non-ISO utilities)
Utility / transmission owner
NorthWestern Energy
Connection point (POI)
69kV line between Fairfield and Bole
Location
Teton County, Montana
Technology
Hydro: 11.5 MW
Total requested
11.5 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study System Impact Re-Study Facility Study
Queue status
Operational
Entered queue
25 May 2007
Proposed online date
June 2009
Came online
June 2009

Location

Marker shows the centre of Teton County; the queue data does not give exact sites.

Power plants in Montana · Transmission lines in Montana

Other requests in Teton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem