United States βΊ Grid βΊ Interconnection queues βΊ Indiana
BATTERY STORAGE Β· MISOBattery storage project J2160, Bartholomew County
Battery storage project J2160, Bartholomew County is a 50.0 MW battery storage request withdrawn in the MISO interconnection queue, in Bartholomew County, Indiana, connecting to DUKE ENERGY INDIANA.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2021 (completed)
- Withdrawn / abandonedDec 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2160
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- DUKE ENERGY INDIANA
- Connection point (POI)
- Gallagher to Columbus 230KV
- Location
- Bartholomew County, Indiana
- Technology
- Battery: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 1 September 2021
- Proposed online date
- August 2024
- Withdrawn
- December 2025
Location
Marker shows the centre of Bartholomew County; the queue data does not give exact sites.
Other requests in Bartholomew County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem