United States βΊ Grid βΊ Interconnection queues βΊ Indiana
SOLAR Β· MISOSolar project J1578, Bartholomew County
Solar project J1578, Bartholomew County is a 200 MW solar request withdrawn in the MISO interconnection queue, in Bartholomew County, Indiana, connecting to DUKE ENERGY INDIANA.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2020 (completed)
- Withdrawn / abandonedAug 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1578
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- DUKE ENERGY INDIANA
- Connection point (POI)
- Columbus -Greenwood Clark Twp 230kV line (Circuit ID 23019)
- Location
- Bartholomew County, Indiana
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 18 June 2020
- Proposed online date
- April 2023
- Withdrawn
- August 2025
Location
Marker shows the centre of Bartholomew County; the queue data does not give exact sites.
Other requests in Bartholomew County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem