BATTERY STORAGE · NYISO

NY13 Energy Storage

NY13 Energy Storage is a 4.0 MW battery storage request withdrawn in the NYISO interconnection queue, in Washington County, New York, connecting to NM-NG.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2019 (completed)
  2. Withdrawn / abandonedOct 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
856
Grid region
NYISO (New York)
Utility / transmission owner
NM-NG
Developer
Boralex US Development, LLC
Connection point (POI)
Battenkill - Mohican 115kV
Location
Washington County, New York
Technology
Battery: 4.0 MW
Total requested
4.0 MW
Queue status
Withdrawn
Entered queue
24 May 2019
Withdrawn
October 2019

Location

Marker shows the centre of Washington County; the queue data does not give exact sites.

Power plants in New York · Transmission lines in New York

Other requests in Washington County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem