Solar + storage project Q61, Clark County

Solar + storage project Q61, Clark County is a 250 MW solar + storage request withdrawn in the West interconnection queue, in Clark County, Nevada, connecting to Los Angeles Department of Water and Power.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2017 (completed)
  2. Withdrawn / abandonedJan 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
Q61
Grid region
West (non-ISO utilities)
Utility / transmission owner
Los Angeles Department of Water and Power
Connection point (POI)
500 kV Moapa-Crystal Gentie
Location
Clark County, Nevada
Technology
Solar: 250 MW Β· Battery
Total requested
250 MW
Queue status
Withdrawn
Entered queue
17 July 2017
Proposed online date
June 2020
Withdrawn
January 2018

Location

Marker shows the centre of Clark County; the queue data does not give exact sites.

Power plants in Nevada Β· Transmission lines in Nevada

Other requests in Clark County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem