United States › Grid › Interconnection queues › California

SOLAR + STORAGE · WEST

Solar + storage project 2023-G2, Fresno County

Solar + storage project 2023-G2, Fresno County is a 800 MW solar + storage request in interconnection study in the West interconnection queue, in Fresno County, California, connecting to WAPA Sierra Nevada.

Queue statusIn planning
  1. PlanningQueued Mar 2023 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Jun 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
2023-G2
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA Sierra Nevada
Connection point (POI)
New Point 500 kV Substation
Location
Fresno County, California
Technology
Solar: 800 MW · Battery
Total requested
800 MW
Service type
NRIS and ERIS
Study phase
Includes a New Point to Tracy 500 kV line as part of Project.
Queue status
Active
Entered queue
1 March 2023
Proposed online date
June 2028

Location

Marker shows the centre of Fresno County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Fresno County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem