United States β€Ί Grid β€Ί Interconnection queues β€Ί Michigan

SOLAR Β· MISO

Solar project J2774, Ionia County

Solar project J2774, Ionia County is a 200 MW solar request withdrawn in the MISO interconnection queue, in Ionia County, Michigan, connecting to WOLVERINE POWER SUPPLY COOPERATIVE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2024 (completed)
  2. Withdrawn / abandonedAug 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J2774
Grid region
MISO (Midcontinent)
Utility / transmission owner
WOLVERINE POWER SUPPLY COOPERATIVE
Connection point (POI)
Other_
Location
Ionia County, Michigan
Technology
Solar: 200 MW
Total requested
200 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 2; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
20 August 2024
Proposed online date
July 2026
Withdrawn
August 2025

Location

Marker shows the centre of Ionia County; the queue data does not give exact sites.

Power plants in Michigan Β· Transmission lines in Michigan

Other requests in Ionia County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem