United States βΊ Grid βΊ Interconnection queues βΊ Illinois
ONSHORE WIND Β· MISOOnshore wind project H003, Mcdonough County
Onshore wind project H003, Mcdonough County is a 200 MW onshore wind request withdrawn in the MISO interconnection queue, in Mcdonough County, Illinois.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2010 (completed)
- Withdrawn / abandonedAug 2012 (project stopped here)
- ConsentedAug 2012 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- H003
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- 138 kV line, 5 miles North of Macomb
- Location
- Mcdonough County, Illinois
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Study phase
- SPA - SIS
- Queue status
- Withdrawn
- Entered queue
- 28 September 2010
- Agreement signed
- 3 August 2012
- Proposed online date
- December 2009
- Withdrawn
- August 2012
Location
Marker shows the centre of Mcdonough County; the queue data does not give exact sites.
Other requests in Mcdonough County
- Onshore wind project J1701, Mcdonough CountyOnshore wind Β· 200 MW Β· in study
- Onshore wind project J3493, Mcdonough CountyOnshore wind Β· 200 MW Β· in study
- Onshore wind project J2189, Mcdonough CountyOnshore wind Β· 15.6 MW Β· in study
- Onshore wind project J456, Mcdonough CountyOnshore wind Β· 150 MW Β· built
- Battery storage project J3851, Mcdonough CountyBattery storage Β· 200 MW Β· withdrawn
- Solar project J3489, Mcdonough CountySolar Β· 105 MW Β· withdrawn
- Solar + storage project J2172, Mcdonough CountySolar + storage Β· 100 MW Β· withdrawn
- Solar project J1243, Mcdonough CountySolar Β· 25.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem