Solar project J3489, Mcdonough County is a 105 MW solar request withdrawn in the MISO interconnection queue, in Mcdonough County, Illinois, connecting to AMEREN TRANSMISSION COMPANY OF ILLINOIS.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2024 (completed)
- Withdrawn / abandonedSep 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3489
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMEREN TRANSMISSION COMPANY OF ILLINOIS
- Connection point (POI)
- Other_
- Location
- Mcdonough County, Illinois
- Technology
- Solar: 105 MW
- Total requested
- 105 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 1
- Queue status
- Withdrawn
- Entered queue
- 15 April 2024
- Proposed online date
- September 2028
- Withdrawn
- September 2025
Location
Marker shows the centre of Mcdonough County; the queue data does not give exact sites.
Other requests in Mcdonough County
- Onshore wind project J1701, Mcdonough CountyOnshore wind Β· 200 MW Β· in study
- Onshore wind project J3493, Mcdonough CountyOnshore wind Β· 200 MW Β· in study
- Onshore wind project J2189, Mcdonough CountyOnshore wind Β· 15.6 MW Β· in study
- Onshore wind project J456, Mcdonough CountyOnshore wind Β· 150 MW Β· built
- Battery storage project J3851, Mcdonough CountyBattery storage Β· 200 MW Β· withdrawn
- Onshore wind project H003, Mcdonough CountyOnshore wind Β· 200 MW Β· withdrawn
- Solar + storage project J2172, Mcdonough CountySolar + storage Β· 100 MW Β· withdrawn
- Solar project J1243, Mcdonough CountySolar Β· 25.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem