ONSHORE WIND · MISO

Onshore wind project J2189, Mcdonough County

Onshore wind project J2189, Mcdonough County is a 15.6 MW onshore wind request in interconnection study in the MISO interconnection queue, in Mcdonough County, Illinois, connecting to AMEREN ILLINOIS.

Queue statusIn planning
  1. PlanningQueued Aug 2021 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2019 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
J2189
Grid region
MISO (Midcontinent)
Utility / transmission owner
AMEREN ILLINOIS
Connection point (POI)
Hornsby Switching Station
Location
Mcdonough County, Illinois
Technology
Wind: 15.6 MW
Total requested
15.6 MW
Service type
Energy only (ERIS)
Study phase
Study Phase: DPP 2; Post GIA Status: Not Started
Queue status
Active
Entered queue
17 August 2021
Proposed online date
December 2019

Location

Marker shows the centre of Mcdonough County; the queue data does not give exact sites.

Power plants in Illinois · Transmission lines in Illinois