United States βΊ Grid βΊ Interconnection queues βΊ North Carolina
GAS Β· SOUTHEASTGas project 8599, Buncombe County
Gas project 8599, Buncombe County is a 470 MW gas request withdrawn in the Southeast interconnection queue, in Buncombe County, North Carolina, connecting to Duke Energy Progress.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2015 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 8599
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Progress
- Developer
- Duke Energy Progress, LLC
- Connection point (POI)
- Asheville Energy Complex 115 kV Switchyard; Asheville Plant
- Location
- Buncombe County, North Carolina
- Technology
- Gas: 470 MW
- Total requested
- 470 MW
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 18 May 2015
Location
Marker shows the centre of Buncombe County; the queue data does not give exact sites.
Power plants in North Carolina Β· Transmission lines in North Carolina
Other requests in Buncombe County
- Battery storage project 191894, Buncombe CountyBattery storage Β· 30.5 MW Β· under construction
- Battery storage project 49220, Buncombe CountyBattery storage Β· 17.3 MW Β· agreement signed
- Solar project 24747, Buncombe CountySolar Β· 9.5 MW Β· agreement signed
- Gas project 900845, Buncombe CountyGas Β· 19.9 MW Β· in study
- Gas project 900843, Buncombe CountyGas Β· 19.9 MW Β· in study
- Gas project 957688, Buncombe CountyGas Β· 5.0 MW Β· in study
- Gas project PP00019, Buncombe CountyGas Β· 5.0 MW Β· in study
- Gas project 957691, Buncombe CountyGas Β· 5.0 MW Β· in study
- Gas project PP00020, Buncombe CountyGas Β· 5.0 MW Β· in study
- Gas project 8598, Buncombe CountyGas Β· 280 MW Β· built
- Gas project 8597, Buncombe CountyGas Β· 280 MW Β· built
- Gas project 8600, Buncombe CountyGas Β· 280 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem