United States β€Ί Grid β€Ί Interconnection queues β€Ί New York

BATTERY STORAGE Β· NYISO

Astoria BESS

Astoria BESS is a 70.0 MW battery storage request withdrawn in the NYISO interconnection queue, in Queens County, New York, connecting to ConEd.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2019 (completed)
  2. Withdrawn / abandonedApr 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
934
Grid region
NYISO (New York)
Utility / transmission owner
ConEd
Developer
Saturn Energy Storage LLC
Connection point (POI)
Astoria West Substation 138 kV
Location
Queens County, New York
Technology
Battery: 70.0 MW
Total requested
70.0 MW
Queue status
Withdrawn
Entered queue
31 October 2019
Withdrawn
April 2020

Location

Marker shows the centre of Queens County; the queue data does not give exact sites.

Power plants in New York Β· Transmission lines in New York

Other requests in Queens County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem