πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

BATTERY STORAGE Β· SPP

Battery storage project GEN-2019-056, Randall County

Battery storage project GEN-2019-056, Randall County is a 100 MW battery storage request withdrawn in the SPP interconnection queue, in Randall County, Texas, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2019 (completed)
  2. Withdrawn / abandonedSep 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2019-056
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Connection point (POI)
Randall 115kV substation
Location
Randall County, Texas
Technology
Battery: 100 MW
Total requested
100 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
24 May 2019
Proposed online date
December 2027
Withdrawn
September 2023

Location

Marker shows the centre of Randall County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Randall County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem