Funkstonw Solar Facility is a 8.8 MW solar request withdrawn in the PJM interconnection queue, in Washington County, Maryland, connecting to APS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2016 (completed)
  2. Withdrawn / abandonedOct 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AB2-027
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
APS
Connection point (POI)
Maple Ave-Mount Lena 34.5kV
Location
Washington County, Maryland
Technology
Solar: 8.8 MW
Total requested
8.8 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Wholesale Market P
Queue status
Withdrawn
Entered queue
10 February 2016
Proposed online date
November 2017
Withdrawn
October 2020

Location

Marker shows the centre of Washington County; the queue data does not give exact sites.

Power plants in Maryland · Transmission lines in Maryland

Other requests in Washington County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem