United States βΊ Grid βΊ Interconnection queues βΊ Michigan
ONSHORE WIND Β· MISOOnshore wind project J906, Muskegon County
Onshore wind project J906, Muskegon County is a 100 MW onshore wind request withdrawn in the MISO interconnection queue, in Muskegon County, Michigan, connecting to METC.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2017 (completed)
- Withdrawn / abandonedFeb 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J906
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- METC
- Connection point (POI)
- Kenowa - Ludington 345 kV Line Tap
- Location
- Muskegon County, Michigan
- Technology
- Wind: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 16 June 2017
- Proposed online date
- July 2020
- Withdrawn
- February 2020
Location
Marker shows the centre of Muskegon County; the queue data does not give exact sites.
Other requests in Muskegon County
- Solar project J1375, Muskegon CountySolar Β· 100 MW Β· under construction
- Solar project J1614, Muskegon CountySolar Β· 250 MW Β· agreement signed
- Solar project J1587, Muskegon CountySolar Β· 100 MW Β· agreement signed
- Onshore wind project J3895, Muskegon CountyOnshore wind Β· 200 MW Β· in study
- Solar project J3682, Muskegon CountySolar Β· 150 MW Β· in study
- Surplus; J1375Battery storage Β· 100 MW Β· in study
- Surplus; J1587Battery storage Β· 50.0 MW Β· in study
- Solar project J1522, Muskegon CountySolar Β· 200 MW Β· withdrawn
- Battery storage project J3486, Muskegon CountyBattery storage Β· 200 MW Β· withdrawn
- Solar project J1362, Muskegon CountySolar Β· 150 MW Β· withdrawn
- Solar project J647, Muskegon CountySolar Β· 147 MW Β· withdrawn
- Onshore wind project J609, Muskegon CountyOnshore wind Β· 136 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem