πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Michigan

BATTERY STORAGE Β· MISO

Battery storage project J3486, Muskegon County

Battery storage project J3486, Muskegon County is a 200 MW battery storage request withdrawn in the MISO interconnection queue, in Muskegon County, Michigan, connecting to WOLVERINE POWER SUPPLY COOPERATIVE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2024 (completed)
  2. Withdrawn / abandonedSep 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J3486
Grid region
MISO (Midcontinent)
Utility / transmission owner
WOLVERINE POWER SUPPLY COOPERATIVE
Connection point (POI)
Rogers 138 kV Substation
Location
Muskegon County, Michigan
Technology
Battery: 200 MW
Total requested
200 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 1
Queue status
Withdrawn
Entered queue
15 April 2024
Proposed online date
June 2028
Withdrawn
September 2025

Location

Marker shows the centre of Muskegon County; the queue data does not give exact sites.

Power plants in Michigan Β· Transmission lines in Michigan

Other requests in Muskegon County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem