United States › Grid › Interconnection queues › Michigan

BATTERY STORAGE · MISO

Surplus; J1375

Surplus; J1375 is a 100 MW battery storage request in interconnection study in the MISO interconnection queue, in Muskegon County, Michigan, connecting to METC.

Queue statusIn planning
  1. PlanningQueued Jan 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Apr 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
S1081
Grid region
MISO (Midcontinent)
Utility / transmission owner
METC
Connection point (POI)
DU PONT - WHITE LAKE 138.0kV
Location
Muskegon County, Michigan
Technology
Battery: 100 MW
Total requested
100 MW
Queue status
Active
Entered queue
13 January 2025
Proposed online date
April 2028

Location

Marker shows the centre of Muskegon County; the queue data does not give exact sites.

Power plants in Michigan · Transmission lines in Michigan

Other requests in Muskegon County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem