United States › Grid › Interconnection queues › California

SOLAR · CAISO

Oro Loma 4 ( Fka Enrico Matson 4)

Oro Loma 4 ( Fka Enrico Matson 4) is a 20.0 MW solar request withdrawn in the CAISO interconnection queue, in Fresno County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2010 (completed)
  2. Withdrawn / abandonedNov 2016 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
648
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Panoche-Oro Loma 115kV Tap
Location
Fresno County, California
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Service type
Network resource (NRIS)
Study phase
Executed
Queue status
Withdrawn
Entered queue
25 August 2010
Proposed online date
December 2018
Withdrawn
November 2016

Location

Marker shows the centre of Fresno County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Fresno County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem