United States › Grid › Interconnection queues › Kentucky
BATTERY STORAGE · SOUTHEASTBattery storage project 25RSC-005, Mccracken County
Battery storage project 25RSC-005, Mccracken County is a 250 MW battery storage request in interconnection study in the Southeast interconnection queue, in Mccracken County, Kentucky, connecting to Tennessee Valley Authority.
- PlanningQueued Jul 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Sep 2030 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 25RSC-005
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Tennessee Valley Authority
- Connection point (POI)
- TVA's SHF MARTIN REACTOR - SHAWNEE- MARTIN, KY 161KV SWITCHING STATION
- Location
- Mccracken County, Kentucky
- Technology
- Battery: 250 MW
- Total requested
- 250 MW
- Study phase
- In Progress (unknown study)
- Queue status
- Active
- Entered queue
- 23 July 2025
- Proposed online date
- September 2030
Location
Marker shows the centre of Mccracken County; the queue data does not give exact sites.
Other requests in Mccracken County
- Solar + storage project LGE-GIS-2021-020, Mccracken CountySolar + storage · 120 MW · agreement signed
- Solar project 609, Mccracken CountySolar · 96.0 MW · in study
- Solar project J1649, Mccracken CountySolar · 60.0 MW · in study
- Solar project LGE-GIS-2021-007, Mccracken CountySolar · 120 MW · suspended
- Gas project LGE-GIS-2009-001, Mccraken CountyGas · 123 MW · built
- Other project 137, Mccracken CountyOther · 950 MW · withdrawn
- Other project G070, Mccracken CountyOther · 900 MW · withdrawn
- Other project 124, Mccracken CountyOther · 640 MW · withdrawn
- Other project 125, Mccracken CountyOther · 340 MW · withdrawn
- Solar + storage project 464, Mccracken CountySolar + storage · 300 MW · withdrawn
- Solar project 500, Mccracken CountySolar · 200 MW · withdrawn
- Solar project J2547, Mccracken CountySolar · 150 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem