United States β€Ί Grid β€Ί Interconnection queues β€Ί Kentucky

OTHER Β· MISO

Other project G070, Mccracken County

Other project G070, Mccracken County is a 900 MW other request withdrawn in the MISO interconnection queue, in Mccracken County, Kentucky.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2000 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G070
Grid region
MISO (Midcontinent)
Connection point (POI)
Unknown
Location
Mccracken County, Kentucky
Technology
Other: 900 MW
Total requested
900 MW
Queue status
Withdrawn
Entered queue
21 December 2000
Proposed online date
June 2003

Location

Marker shows the centre of Mccracken County; the queue data does not give exact sites.

Power plants in Kentucky Β· Transmission lines in Kentucky

Other requests in Mccracken County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem