SOLAR Β· MISOSolar project J2547, Mccracken County
Solar project J2547, Mccracken County is a 150 MW solar request withdrawn in the MISO interconnection queue, in Mccracken County, Kentucky, connecting to BIG RIVERS ELECTRIC CORPORATION.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedOct 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2547
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- BIG RIVERS ELECTRIC CORPORATION
- Connection point (POI)
- Bryan Road - McCracken County 161.0kV
- Location
- Mccracken County, Kentucky
- Technology
- Solar: 150 MW
- Total requested
- 150 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 15 September 2022
- Proposed online date
- July 2027
- Withdrawn
- October 2025
Location
Marker shows the centre of Mccracken County; the queue data does not give exact sites.
Other requests in Mccracken County
- Solar + storage project LGE-GIS-2021-020, Mccracken CountySolar + storage Β· 120 MW Β· agreement signed
- Battery storage project 25RSC-005, Mccracken CountyBattery storage Β· 250 MW Β· in study
- Solar project 609, Mccracken CountySolar Β· 96.0 MW Β· in study
- Solar project J1649, Mccracken CountySolar Β· 60.0 MW Β· in study
- Solar project LGE-GIS-2021-007, Mccracken CountySolar Β· 120 MW Β· suspended
- Gas project LGE-GIS-2009-001, Mccraken CountyGas Β· 123 MW Β· built
- Other project 137, Mccracken CountyOther Β· 950 MW Β· withdrawn
- Other project G070, Mccracken CountyOther Β· 900 MW Β· withdrawn
- Other project 124, Mccracken CountyOther Β· 640 MW Β· withdrawn
- Other project 125, Mccracken CountyOther Β· 340 MW Β· withdrawn
- Solar + storage project 464, Mccracken CountySolar + storage Β· 300 MW Β· withdrawn
- Solar project 500, Mccracken CountySolar Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem