United States βΊ Grid βΊ Interconnection queues βΊ Maryland
GAS Β· PJMGas project B22, Baltimore City County
Gas project B22, Baltimore City County is a 9.9 MW gas request withdrawn in the PJM interconnection queue, in Baltimore City County, Maryland, connecting to BGE.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 1999 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- B22
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- BGE
- Connection point (POI)
- Gould St. 34.5 kV
- Location
- Baltimore City County, Maryland
- Technology
- Gas: 9.9 MW
- Total requested
- 9.9 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 11 August 1999
Location
Marker shows the centre of Baltimore City County; the queue data does not give exact sites.
Other requests in Baltimore City County
- Gould StreetGas Β· 101 MW Β· built
- Hawkins PointGas Β· 10.0 MW Β· built
- Sun PaperOther Β· 4.0 MW Β· built
- Fairfield Renewable Energy FacilityOther Β· 132 MW Β· withdrawn
- Fairfield Renewable Energy FacilityOther Β· 25.0 MW Β· withdrawn
- Gas project AE1-151, Baltimore City CountyGas Β· 9.0 MW Β· withdrawn
- Battery storage project AB1-020, Baltimore City CountyBattery storage Β· 0.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem