🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Maryland

OTHER · PJM

Fairfield Renewable Energy Facility

Fairfield Renewable Energy Facility is a 25.0 MW other request withdrawn in the PJM interconnection queue, in Baltimore City County, Maryland, connecting to BGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2010 (completed)
  2. Withdrawn / abandonedMay 2016 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
W1-033
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
BGE
Connection point (POI)
Pumphrey 115kV
Location
Baltimore City County, Maryland
Technology
Other: 25.0 MW
Total requested
25.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
Queue status
Withdrawn
Entered queue
25 February 2010
Proposed online date
December 2016
Withdrawn
May 2016

Location

Marker shows the centre of Baltimore City County; the queue data does not give exact sites.

Power plants in Maryland · Transmission lines in Maryland

Other requests in Baltimore City County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem