United States βΊ Grid βΊ Interconnection queues βΊ Kansas
BATTERY STORAGE Β· SPPBattery storage project GEN-2023-175, Grant County
Battery storage project GEN-2023-175, Grant County is a 200 MW battery storage request withdrawn in the SPP interconnection queue, in Grant County, Kansas, connecting to SUNC.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2023 (completed)
- Withdrawn / abandonedMar 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2023-175
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SUNC
- Connection point (POI)
- Hickock 115 kV Substation
- Location
- Grant County, Kansas
- Technology
- Battery: 200 MW
- Total requested
- 200 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 2 October 2023
- Proposed online date
- September 2029
- Withdrawn
- March 2024
Location
Marker shows the centre of Grant County; the queue data does not give exact sites.
Other requests in Grant County
- Solar project GEN-2021-023, Grant CountySolar Β· 306 MW Β· agreement signed
- Solar project GEN-2021-035, Grant CountySolar Β· 113 MW Β· in study
- Gas project GEN-2012-007, Grant CountyGas Β· 120 MW Β· built
- Solar project GEN-2017-110, Grant CountySolar Β· 100 MW Β· withdrawn
- Solar project GEN-2014-045, Grant CountySolar Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem