United States › Grid › Interconnection queues › New York
OFFSHORE WIND · NYISONY Interconnection 5
NY Interconnection 5 is a 150 MW offshore wind request withdrawn in the NYISO interconnection queue, in New York County, New York, connecting to ConEd.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1433
- Grid region
- NYISO (New York)
- Utility / transmission owner
- ConEd
- Developer
- NY Interconnection LLC
- Connection point (POI)
- Fox Hills 138kV Substation
- Location
- New York County, New York
- Technology
- Offshore Wind: 150 MW
- Total requested
- 150 MW
- Queue status
- Withdrawn
- Entered queue
- 9 September 2022
Location
Marker shows the centre of New York County; the queue data does not give exact sites.
Other requests in New York County
- East River RepoweringGas · 288 MW · built
- East River RepoweringGas · 288 MW · built
- KeySpan RavenswoodGas · 270 MW · built
- KeySpan RavenswoodGas · 270 MW · built
- Hell GateGas · 79.9 MW · built
- Harlem River YardsGas · 79.9 MW · built
- Harlem River YardsGas · 79.9 MW · built
- Hell GateGas · 79.9 MW · built
- Vernon BlvdGas · 79.9 MW · built
- Vernon BlvdGas · 79.9 MW · built
- 23rd St and 3rd AveGas · 79.9 MW · built
- 23rd St and 3rd AveGas · 79.9 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem