United States β€Ί Grid β€Ί Interconnection queues β€Ί Wisconsin

ONSHORE WIND Β· MISO

Onshore wind project J084, Grant County

Onshore wind project J084, Grant County is a 50.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Grant County, Wisconsin.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2009 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedSep 2011 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J084
Grid region
MISO (Midcontinent)
Connection point (POI)
Bloomington 69 kV Substation
Location
Grant County, Wisconsin
Technology
Wind: 50.0 MW
Total requested
50.0 MW
Study phase
Network Upgrade
Queue status
Withdrawn
Entered queue
5 October 2009
Agreement signed
8 September 2011
Proposed online date
December 2012

Location

Marker shows the centre of Grant County; the queue data does not give exact sites.

Power plants in Wisconsin Β· Transmission lines in Wisconsin

Other requests in Grant County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem