United States βΊ Grid βΊ Interconnection queues βΊ New York
GAS Β· NYISOBerrians East Replacement
Berrians East Replacement is a 94.2 MW gas request withdrawn in the NYISO interconnection queue, in Queens County, New York, connecting to CONED.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2012 (completed)
- Withdrawn / abandonedJan 2023 (project stopped here)
- ConsentedJul 2019 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 393
- Grid region
- NYISO (New York)
- Utility / transmission owner
- CONED
- Developer
- NRG Berrians East Development, LLC
- Connection point (POI)
- Astoria East 138kV Substation
- Location
- Queens County, New York
- Technology
- Gas: 94.2 MW Β· Oil
- Total requested
- 94.2 MW
- Queue status
- Withdrawn
- Entered queue
- 16 October 2012
- Agreement signed
- 9 July 2019
- Withdrawn
- January 2023
Location
Marker shows the centre of Queens County; the queue data does not give exact sites.
Other requests in Queens County
- Astoria Energy StorageBattery storage Β· 100 MW Β· in study
- Harlem River YardBattery storage Β· 79.9 MW Β· in study
- Luyster Creek Energy Storage 2Battery storage Β· 79.0 MW Β· in study
- Luyster Creek Energy Storage 1Battery storage Β· 57.3 MW Β· in study
- Luyster Creek Energy Storage 3Battery storage Β· 15.0 MW Β· in study
- Astoria Energy IIGas Β· 617 MW Β· built
- Astoria Energy IIGas Β· 617 MW Β· built
- Poletti ExpansionGas Β· 500 MW Β· built
- Astoria Energy - Phase 1Gas Β· 500 MW Β· built
- Astoria Energy - Phase 1Gas Β· 500 MW Β· built
- Poletti ExpansionGas Β· 500 MW Β· built
- OW Ocean Winds East 5Offshore wind Β· 1,600 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem