United States βΊ Grid βΊ Interconnection queues βΊ South Dakota
ONSHORE WIND Β· SPPOnshore wind project GEN-2019-060, Day County
Onshore wind project GEN-2019-060, Day County is a 150 MW onshore wind request withdrawn in the SPP interconnection queue, in Day County, South Dakota, connecting to BEPC.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2019 (completed)
- Withdrawn / abandonedDec 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- OperatingDec 2025 (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2019-060
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- BEPC
- Connection point (POI)
- Groton 345 kV substation
- Location
- Day County, South Dakota
- Technology
- Wind: 150 MW
- Total requested
- 150 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 22 May 2019
- Proposed online date
- December 2025
- Came online
- December 2025
- Withdrawn
- December 2022
Location
Marker shows the centre of Day County; the queue data does not give exact sites.
Power plants in South Dakota Β· Transmission lines in South Dakota
Other requests in Day County
- Wind + storage project J3468, Day CountyWind + storage Β· 300 MW Β· in study
- Onshore wind project J3279, Day CountyOnshore wind Β· 300 MW Β· withdrawn
- Onshore wind project J933, Day CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project J1521, Day CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project GEN-2015-097, Day CountyOnshore wind Β· 100 MW Β· withdrawn
- Battery storage project GEN-2019-032, Day CountyBattery storage Β· 63.1 MW Β· withdrawn
- Solar project GEN-2019-057, Day CountySolar Β· 63.1 MW Β· withdrawn
- Onshore wind project GI-0302, Day CountyOnshore wind Β· 49.0 MW Β· withdrawn
- Onshore wind project GEN-2016-164, Day CountyOnshore wind Β· 7.9 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem