BATTERY STORAGE Β· SPP

Battery storage project GEN-2019-032, Day County

Battery storage project GEN-2019-032, Day County is a 63.1 MW battery storage request withdrawn in the SPP interconnection queue, in Day County, South Dakota, connecting to BEPC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandonedJun 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2019-032
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
BEPC
Connection point (POI)
Huron 230kV station
Location
Day County, South Dakota
Technology
Battery: 63.1 MW
Total requested
63.1 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
30 April 2019
Proposed online date
December 2020
Withdrawn
June 2022

Location

Marker shows the centre of Day County; the queue data does not give exact sites.

Power plants in South Dakota Β· Transmission lines in South Dakota

Other requests in Day County