United States β€Ί Grid β€Ί Interconnection queues β€Ί Colorado

ONSHORE WIND Β· WEST

Onshore wind project 17-08073, Larimer County

Onshore wind project 17-08073, Larimer County is a 22.0 MW onshore wind request withdrawn in the West interconnection queue, in Larimer County, Colorado, connecting to Platte River Power Authority.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2017 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
17-08073
Grid region
West (non-ISO utilities)
Utility / transmission owner
Platte River Power Authority
Connection point (POI)
Rawhide 230kV
Location
Larimer County, Colorado
Technology
Wind: 22.0 MW
Total requested
22.0 MW
Queue status
Withdrawn
Entered queue
7 August 2017
Proposed online date
December 2019

Location

Marker shows the centre of Larimer County; the queue data does not give exact sites.

Power plants in Colorado Β· Transmission lines in Colorado

Other requests in Larimer County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem