United States βΊ Grid βΊ Interconnection queues βΊ Ohio
ONSHORE WIND Β· PJMOnshore wind project W4-021A, Richland County
Onshore wind project W4-021A, Richland County is a 200 MW onshore wind request withdrawn in the PJM interconnection queue, in Richland County, Ohio, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2010 (completed)
- Withdrawn / abandonedSep 2012 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- W4-021A
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Richland & Crawford
- Location
- Richland County, Ohio
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 30 November 2010
- Proposed online date
- September 2012
- Withdrawn
- September 2012
Location
Marker shows the centre of Richland County; the queue data does not give exact sites.
Other requests in Richland County
- Battery storage project AH2-374, Richland CountyBattery storage Β· 84.0 MW Β· in study
- Black Fork WindOnshore wind Β· 200 MW Β· withdrawn
- Solar project AH1-609, Richland CountySolar Β· 168 MW Β· withdrawn
- Solar project AH1-608, Richland CountySolar Β· 49.3 MW Β· withdrawn
- Gas project G498, Richland CountyGas Β· 1.1 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem