United States βΊ Grid βΊ Interconnection queues βΊ Ohio
SOLAR Β· PJMSolar project AH1-608, Richland County
Solar project AH1-608, Richland County is a 49.3 MW solar request withdrawn in the PJM interconnection queue, in Richland County, Ohio, connecting to ATSI.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2021 (completed)
- Withdrawn / abandonedOct 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AH1-608
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ATSI
- Connection point (POI)
- Milliron-Brookside 138kV
- Location
- Richland County, Ohio
- Technology
- Solar: 49.3 MW
- Total requested
- 49.3 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 10 September 2021
- Proposed online date
- April 2025
- Withdrawn
- October 2021
Location
Marker shows the centre of Richland County; the queue data does not give exact sites.
Other requests in Richland County
- Battery storage project AH2-374, Richland CountyBattery storage Β· 84.0 MW Β· in study
- Black Fork WindOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project W4-021A, Richland CountyOnshore wind Β· 200 MW Β· withdrawn
- Solar project AH1-609, Richland CountySolar Β· 168 MW Β· withdrawn
- Gas project G498, Richland CountyGas Β· 1.1 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem