Black Fork Wind is a 200 MW onshore wind request withdrawn in the PJM interconnection queue, in Richland County, Ohio, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2008 (completed)
- Withdrawn / abandonedJan 2019 (project stopped here)
- ConsentedApr 2013 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- U4-001
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Howard 138kV
- Location
- Richland County, Ohio
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 3 November 2008
- Agreement signed
- 11 April 2013
- Proposed online date
- November 2019
- Withdrawn
- January 2019
Location
Marker shows the centre of Richland County; the queue data does not give exact sites.
Other requests in Richland County
- Battery storage project AH2-374, Richland CountyBattery storage Β· 84.0 MW Β· in study
- Onshore wind project W4-021A, Richland CountyOnshore wind Β· 200 MW Β· withdrawn
- Solar project AH1-609, Richland CountySolar Β· 168 MW Β· withdrawn
- Solar project AH1-608, Richland CountySolar Β· 49.3 MW Β· withdrawn
- Gas project G498, Richland CountyGas Β· 1.1 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem