United States β€Ί Grid β€Ί Interconnection queues β€Ί Florida

GAS Β· SOUTHEAST

Gas project 26, Pinellas County

Gas project 26, Pinellas County is a 500 MW gas request withdrawn in the Southeast interconnection queue, in Pinellas County, Florida, connecting to Duke Energy Florida.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2005 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
26
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Duke Energy Florida
Developer
Masked
Connection point (POI)
Bartow Substation
Location
Pinellas County, Florida
Technology
Gas: 500 MW
Total requested
500 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
12 September 2005
Proposed online date
July 2009

Location

Marker shows the centre of Pinellas County; the queue data does not give exact sites.

Power plants in Florida Β· Transmission lines in Florida

Other requests in Pinellas County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem