United States › Grid › Interconnection queues › Florida
GAS · SOUTHEASTGas project 28, Pinellas County
Gas project 28, Pinellas County is a 223 MW gas request built and operating in the Southeast interconnection queue, in Pinellas County, Florida, connecting to Duke Energy Florida.
Request details
- Queue ID
- 28
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Duke Energy Florida, LLC
- Connection point (POI)
- Bartow Substation
- Location
- Pinellas County, Florida
- Technology
- Gas: 223 MW
- Total requested
- 223 MW
- Service type
- Network resource (NRIS)
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 13 September 2005
- Proposed online date
- December 2008
- Came online
- June 2009
Location
Marker shows the centre of Pinellas County; the queue data does not give exact sites.
Other requests in Pinellas County
- Battery storage project 292, Pinellas CountyBattery storage · 225 MW · under construction
- Gas project 328, Pinellas CountyGas · 172 MW · under construction
- Gas project 33, Pinellas CountyGas · 418 MW · built
- Gas project 30, Pinellas CountyGas · 223 MW · built
- Gas project 29, Pinellas CountyGas · 223 MW · built
- Gas project 27, Pinellas CountyGas · 223 MW · built
- Gas project 26, Pinellas CountyGas · 500 MW · withdrawn
- Gas project 65, Pinellas CountyGas · 223 MW · withdrawn
- Gas project 64, Pinellas CountyGas · 223 MW · withdrawn
- Gas project 34, Pinellas CountyGas · 223 MW · withdrawn
- Gas project 35, Pinellas CountyGas · 223 MW · withdrawn
- Gas project 36, Pinellas CountyGas · 207 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem