GAS Β· SOUTHEASTGas project 36, Pinellas County
Gas project 36, Pinellas County is a 207 MW gas request withdrawn in the Southeast interconnection queue, in Pinellas County, Florida, connecting to Duke Energy Florida.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2006 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 36
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Duke Energy Florida, LLC
- Connection point (POI)
- Bartow Substation
- Location
- Pinellas County, Florida
- Technology
- Gas: 207 MW
- Total requested
- 207 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 6 June 2006
- Proposed online date
- December 2009
Location
Marker shows the centre of Pinellas County; the queue data does not give exact sites.
Other requests in Pinellas County
- Battery storage project 292, Pinellas CountyBattery storage Β· 225 MW Β· under construction
- Gas project 328, Pinellas CountyGas Β· 172 MW Β· under construction
- Gas project 33, Pinellas CountyGas Β· 418 MW Β· built
- Gas project 28, Pinellas CountyGas Β· 223 MW Β· built
- Gas project 30, Pinellas CountyGas Β· 223 MW Β· built
- Gas project 29, Pinellas CountyGas Β· 223 MW Β· built
- Gas project 27, Pinellas CountyGas Β· 223 MW Β· built
- Gas project 26, Pinellas CountyGas Β· 500 MW Β· withdrawn
- Gas project 65, Pinellas CountyGas Β· 223 MW Β· withdrawn
- Gas project 64, Pinellas CountyGas Β· 223 MW Β· withdrawn
- Gas project 34, Pinellas CountyGas Β· 223 MW Β· withdrawn
- Gas project 35, Pinellas CountyGas Β· 223 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem