United States βΊ Grid βΊ Interconnection queues βΊ Maryland
OTHER Β· PJMOther project AE1-077, Allegany County
Other project AE1-077, Allegany County is a 100 MW other request withdrawn in the PJM interconnection queue, in Allegany County, Maryland, connecting to BGE.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2018 (completed)
- Withdrawn / abandonedJul 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AE1-077
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- BGE
- Connection point (POI)
- Sandy Springs-High Ridge 230 kV
- Location
- Allegany County, Maryland
- Technology
- Other: 100 MW
- Total requested
- 100 MW
- Service type
- Energy only (ERIS)
- Study phase
- Available studies: System Impact Study, Facilities Study
- Queue status
- Withdrawn
- Entered queue
- 7 August 2018
- Proposed online date
- June 2020
- Withdrawn
- July 2022
Location
Marker shows the centre of Allegany County; the queue data does not give exact sites.
Other requests in Allegany County
- Onshore wind project AE2-289, Allegany CountyOnshore wind Β· 80.0 MW Β· agreement signed
- Solar project AH2-052, Allegany CountySolar Β· 2.0 MW Β· in study
- Dans MountainOnshore wind Β· 54.9 MW Β· built
- Jade MeadowSolar Β· 19.8 MW Β· built
- Solar project AF2-360, Allegany CountySolar Β· 125 MW Β· withdrawn
- Solar project AH1-621, Allegany CountySolar Β· 120 MW Β· withdrawn
- Solar project AG2-615, Allegany CountySolar Β· 100 MW Β· withdrawn
- Battery storage project AG2-308, Allegany CountyBattery storage Β· 100 MW Β· withdrawn
- Solar + storage project AH1-342, Allegany CountySolar + storage Β· 75.0 MW Β· withdrawn
- Solar project AF1-044, Allegany CountySolar Β· 45.0 MW Β· withdrawn
- Pigtoe Bobcat SolarSolar Β· 20.0 MW Β· withdrawn
- Dan's Mountain Solar ProjectSolar Β· 19.9 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem