πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

HYDRO Β· SPP

Hydro project GEN-2008-094, Wilbarger County

Hydro project GEN-2008-094, Wilbarger County is a 100 MW hydro request withdrawn in the SPP interconnection queue, in Wilbarger County, Texas, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2008 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2008-094
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
AEP
Location
Wilbarger County, Texas
Technology
Hydro: 100 MW
Total requested
100 MW
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
19 August 2008
Proposed online date
September 2011

Location

Marker shows the centre of Wilbarger County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Wilbarger County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem