Solar project 53, Thurston County

Solar project 53, Thurston County is a 198 MW solar request withdrawn in the West interconnection queue, in Thurston County, Washington, connecting to Puget Sound Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2017 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
53
Grid region
West (non-ISO utilities)
Utility / transmission owner
Puget Sound Energy
Connection point (POI)
Tono-Olympia 115kV Line, Tono-Tenino 115kV line & Tono substation
Location
Thurston County, Washington
Technology
Solar: 198 MW
Total requested
198 MW
Service type
NRIS and ERIS
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
17 October 2017
Proposed online date
October 2019

Location

Marker shows the centre of Thurston County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Thurston County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem