Solar project 63, Thurston County

Solar project 63, Thurston County is a 105 MW solar request withdrawn in the West interconnection queue, in Thurston County, Washington, connecting to Puget Sound Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2018 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
63
Grid region
West (non-ISO utilities)
Utility / transmission owner
Puget Sound Energy
Connection point (POI)
Longmire/Yelm/ Blumaer Substation
Location
Thurston County, Washington
Technology
Solar: 105 MW
Total requested
105 MW
Service type
NRIS and ERIS
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
16 August 2018
Proposed online date
October 2022

Location

Marker shows the centre of Thurston County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Thurston County