πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

BATTERY STORAGE Β· WEST

Battery storage project 118, Thurston County

Battery storage project 118, Thurston County is a 100 MW battery storage request withdrawn in the West interconnection queue, in Thurston County, Washington, connecting to Puget Sound Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2021 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
118
Grid region
West (non-ISO utilities)
Utility / transmission owner
Puget Sound Energy
Connection point (POI)
Rochester 115 kV
Location
Thurston County, Washington
Technology
Battery: 100 MW
Total requested
100 MW
Service type
Network resource (NRIS)
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
25 August 2021
Proposed online date
September 2024

Location

Marker shows the centre of Thurston County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Thurston County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem