United States βΊ Grid βΊ Interconnection queues βΊ Wisconsin
SOLAR Β· MISOSolar project J1011, Kenosha County
Solar project J1011, Kenosha County is a 400 MW solar request withdrawn in the MISO interconnection queue, in Kenosha County, Wisconsin, connecting to American Transmission Co..
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2018 (completed)
- Withdrawn / abandonedMay 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1011
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- American Transmission Co.
- Connection point (POI)
- Arcadian - Zion 345kV Line Tap
- Location
- Kenosha County, Wisconsin
- Technology
- Solar: 400 MW
- Total requested
- 400 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 12 March 2018
- Proposed online date
- September 2022
- Withdrawn
- May 2020
Location
Marker shows the centre of Kenosha County; the queue data does not give exact sites.
Power plants in Wisconsin Β· Transmission lines in Wisconsin
Other requests in Kenosha County
- Solar project J878, Kenosha CountySolar Β· 200 MW Β· under construction
- Solar project J1778, Kenosha CountySolar Β· 100 MW Β· agreement signed
- Battery storage project J1316, Kenosha CountyBattery storage Β· 50.0 MW Β· agreement signed
- Red Oak Ridge Energy CenterGas Β· 1,211 MW Β· in study
- Gas project J4165, Kenosha CountyGas Β· 1,203 MW Β· in study
- Battery storage project J1895, Kenosha CountyBattery storage Β· 200 MW Β· in study
- Battery storage project J3785, Kenosha CountyBattery storage Β· 200 MW Β· in study
- Battery storage project J1934, Kenosha CountyBattery storage Β· 150 MW Β· in study
- Gas project J3936, Kenosha CountyGas Β· 132 MW Β· in study
- Surplus; J1316Gas Β· 132 MW Β· in study
- Solar project J2891, Kenosha CountySolar Β· 50.0 MW Β· in study
- Other project G167, Kenosha CountyOther Β· 1,200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem