United States β€Ί Grid β€Ί Interconnection queues β€Ί Illinois

SOLAR + STORAGE Β· PJM

Solar + storage project AE2-310, Kankakee County

Solar + storage project AE2-310, Kankakee County is a 85.0 MW solar + storage request withdrawn in the PJM interconnection queue, in Kankakee County, Illinois, connecting to ComEd.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2019 (completed)
  2. Withdrawn / abandonedFeb 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AE2-310
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ComEd
Connection point (POI)
Wilmington-Davis Creek
Location
Kankakee County, Illinois
Technology
Solar: 85.0 MW Β· Battery
Total requested
85.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study
Queue status
Withdrawn
Entered queue
29 March 2019
Proposed online date
May 2021
Withdrawn
February 2020

Location

Marker shows the centre of Kankakee County; the queue data does not give exact sites.

Power plants in Illinois Β· Transmission lines in Illinois

Other requests in Kankakee County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem