United States β€Ί Grid β€Ί Interconnection queues β€Ί Iowa

ONSHORE WIND Β· MISO

Onshore wind project J764, Story County

Onshore wind project J764, Story County is a 12.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Story County, Iowa.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2016 (completed)
  2. Withdrawn / abandonedJul 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J764
Grid region
MISO (Midcontinent)
Connection point (POI)
Unknown
Location
Story County, Iowa
Technology
Wind: 12.0 MW
Total requested
12.0 MW
Study phase
Feasibility
Queue status
Withdrawn
Entered queue
14 November 2016
Proposed online date
January 2018
Withdrawn
July 2017

Location

Marker shows the centre of Story County; the queue data does not give exact sites.

Power plants in Iowa Β· Transmission lines in Iowa

Other requests in Story County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem