United States βΊ Grid βΊ Interconnection queues βΊ Iowa
BATTERY STORAGE Β· MISOBattery storage project J1321, Story County
Battery storage project J1321, Story County is a 65.0 MW battery storage request withdrawn in the MISO interconnection queue, in Story County, Iowa, connecting to MIDAMERICAN ENERGY COMPANY.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2019 (completed)
- Withdrawn / abandonedFeb 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1321
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- MIDAMERICAN ENERGY COMPANY
- Connection point (POI)
- O'Brien - Kossuth 345 kV Line Tap
- Location
- Story County, Iowa
- Technology
- Battery: 65.0 MW
- Total requested
- 65.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 29 April 2019
- Proposed online date
- October 2023
- Withdrawn
- February 2022
Location
Marker shows the centre of Story County; the queue data does not give exact sites.
Other requests in Story County
- Solar project J3464, Story CountySolar Β· 200 MW Β· in study
- Solar project J2078, Story CountySolar Β· 200 MW Β· in study
- Onshore wind project G798, Story CountyOnshore wind Β· 150 MW Β· built
- Onshore wind project G612, Story CountyOnshore wind Β· 150 MW Β· built
- Onshore wind project J2106, Story CountyOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project G499, Story CountyOnshore wind Β· 110 MW Β· withdrawn
- Onshore wind project J1801, Story CountyOnshore wind Β· 39.0 MW Β· withdrawn
- Onshore wind project J1728, Story CountyOnshore wind Β· 39.0 MW Β· withdrawn
- Onshore wind project J103, Story CountyOnshore wind Β· 20.0 MW Β· withdrawn
- Onshore wind project J764, Story CountyOnshore wind Β· 12.0 MW Β· withdrawn
- Onshore wind project J768, Story CountyOnshore wind Β· 12.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem