United States β€Ί Grid β€Ί Interconnection queues β€Ί Iowa

BATTERY STORAGE Β· MISO

Battery storage project J1321, Story County

Battery storage project J1321, Story County is a 65.0 MW battery storage request withdrawn in the MISO interconnection queue, in Story County, Iowa, connecting to MIDAMERICAN ENERGY COMPANY.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandonedFeb 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J1321
Grid region
MISO (Midcontinent)
Utility / transmission owner
MIDAMERICAN ENERGY COMPANY
Connection point (POI)
O'Brien - Kossuth 345 kV Line Tap
Location
Story County, Iowa
Technology
Battery: 65.0 MW
Total requested
65.0 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: GIA In Process; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
29 April 2019
Proposed online date
October 2023
Withdrawn
February 2022

Location

Marker shows the centre of Story County; the queue data does not give exact sites.

Power plants in Iowa Β· Transmission lines in Iowa

Other requests in Story County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem