ONSHORE WIND Β· MISOOnshore wind project J2106, Story County
Onshore wind project J2106, Story County is a 150 MW onshore wind request withdrawn in the MISO interconnection queue, in Story County, Iowa, connecting to ITC MIDWEST.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2021 (completed)
- Withdrawn / abandonedOct 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2106
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ITC MIDWEST
- Connection point (POI)
- Story County 161 kV
- Location
- Story County, Iowa
- Technology
- Wind: 150 MW
- Total requested
- 150 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 3; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 3 August 2021
- Proposed online date
- October 2024
- Withdrawn
- October 2025
Location
Marker shows the centre of Story County; the queue data does not give exact sites.
Other requests in Story County
- Solar project J3464, Story CountySolar Β· 200 MW Β· in study
- Solar project J2078, Story CountySolar Β· 200 MW Β· in study
- Onshore wind project G798, Story CountyOnshore wind Β· 150 MW Β· built
- Onshore wind project G612, Story CountyOnshore wind Β· 150 MW Β· built
- Onshore wind project G499, Story CountyOnshore wind Β· 110 MW Β· withdrawn
- Battery storage project J1321, Story CountyBattery storage Β· 65.0 MW Β· withdrawn
- Onshore wind project J1801, Story CountyOnshore wind Β· 39.0 MW Β· withdrawn
- Onshore wind project J1728, Story CountyOnshore wind Β· 39.0 MW Β· withdrawn
- Onshore wind project J103, Story CountyOnshore wind Β· 20.0 MW Β· withdrawn
- Onshore wind project J764, Story CountyOnshore wind Β· 12.0 MW Β· withdrawn
- Onshore wind project J768, Story CountyOnshore wind Β· 12.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem