ONSHORE WIND Β· WEST

Onshore wind project G0360, Grays Harbor County

Onshore wind project G0360, Grays Harbor County is a 6.0 MW onshore wind request withdrawn in the West interconnection queue, in Grays Harbor County, Washington.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2009 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G0360
Grid region
West (non-ISO utilities)
Connection point (POI)
Grays Harbor PUDβ€šΓ„Γ΄s 15 kV Distribution line
Location
Grays Harbor County, Washington
Technology
Wind: 6.0 MW
Total requested
6.0 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
25 March 2009
Proposed online date
July 2009

Location

Marker shows the centre of Grays Harbor County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Grays Harbor County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem