United States › Grid › Interconnection queues › Washington
OTHER · WESTGrays Harbor Project
Grays Harbor Project is a 39.0 MW other request built and operating in the West interconnection queue, in Grays Harbor County, Washington, connecting to Grays Harbor Energy LLC.
Request details
- Queue ID
- G0622
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Grays Harbor Energy LLC
- Developer
- Grays Harbor Energy LLC
- Connection point (POI)
- Satsop 230 kV Substation
- Location
- Grays Harbor County, Washington
- Technology
- Other: 39.0 MW
- Total requested
- 39.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 12 April 2019
- Proposed online date
- October 2020
Location
Marker shows the centre of Grays Harbor County; the queue data does not give exact sites.
Power plants in Washington · Transmission lines in Washington
Other requests in Grays Harbor County
- Gas project 54, Grays Harbor CountyGas · 199 MW · suspended
- Grays Harbor 1Gas · 659 MW · built
- Coastal Energy ProjectOnshore wind · 6.0 MW · built
- Onshore wind project G0815, Grays Harbor CountyOnshore wind · 1,000 MW · withdrawn
- Wind + storage project G0735, Grays Harbor CountyWind + storage · 1,000 MW · withdrawn
- Onshore wind project G0814, Grays Harbor CountyOnshore wind · 1,000 MW · withdrawn
- Onshore wind project G0816, Grays Harbor CountyOnshore wind · 1,000 MW · withdrawn
- Gas project G0289, Grays Harbor CountyGas · 628 MW · withdrawn
- Gas project G0321, Grays Harbor CountyGas · 290 MW · withdrawn
- Other project G0371, Grays Harbor CountyOther · 65.0 MW · withdrawn
- Gas project G0575, Grays Harbor CountyGas · 51.0 MW · withdrawn
- Onshore wind project G0360, Grays Harbor CountyOnshore wind · 6.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem