πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

ONSHORE WIND Β· WEST

Onshore wind project G0815, Grays Harbor County

Onshore wind project G0815, Grays Harbor County is a 1,000 MW onshore wind request withdrawn in the West interconnection queue, in Grays Harbor County, Washington.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G0815
Grid region
West (non-ISO utilities)
Connection point (POI)
Tacoma Substation at 500 kV
Location
Grays Harbor County, Washington
Technology
Wind: 1,000 MW
Total requested
1,000 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
3 October 2022
Proposed online date
May 2030

Location

Marker shows the centre of Grays Harbor County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Grays Harbor County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem